What's new in version 2404.0.0.0

Release Note09/16/20242 min read

Features

With this release of the Aptean Process Manufacturing extension, you can:

  • Use the backward flushing method for component items irrespective of whether the Reallocate Consumption from Main Item checkbox is selected on the production BOM line. Additionally, when this configuration is active, the backward flushing method function occurs first upon changing the production order status to Finished. Subsequently, the consumption item reallocation function takes place.
  • Specify if the internal movement lines should include the inventory demand exceeding the available supply when creating the internal movements through the Create Consolidate Production Movement page.
  • Exclude the internal movement lines that lack values in either the From Bin Code or To Bin Code fields while creating inventory movement.

For more information, see Consolidated Pick and Consolidated Consumption.

UI/UX changes

The Include Lines for Shortages toggle is added to the Create Consolidated Production Movement page.

Resolved issues

The following issues have been resolved in this release.

IDDescription
194535When executing the Optimize Batch Size action on the Released Production Order page, the system updates the Routing No. field in the header with the routing number linked to the item, instead of maintaining it with the routing number associated with the relevant production scenario on the line.
196663
  • When executing the Calculate Regenerative Plan action on the Planning Worksheets page, the system creates lines for main and component items with different reference order numbers except for the last main and component items. This occurs when multiple main items are involved.
  • When executing the Refresh Planning Line action for multiple lines, specific lines are deleted from the Planning Worksheets page.