What's new in version 2512.2.0.0

Shop Floor Production (BC)  •  Release Note  •  11/26/2025  • 

Enhancements/Modifications

With this release of the Aptean Shop Floor Production (BC) extension,

  • You can open work instructions directly from the Instructions page by right-clicking any work instruction document and selecting the Open in new tab button to view it in a separate browser tab for easier reference.

  • The translation file for the Swedish (sv-SE) language has been updated with standard texts for better readability.

UI/UX changes

The Open in new tab button has been added to the Instructions page.

Resolved issues

The following issues have been resolved in this release.

IDDescription
331675The system incorrectly increments the lot number while posting the output on the shop floor production. This issue occurs when the Output Lot Preview field value is set to Increment No. Series on the Shop Floor Production Setup page.
319983The system displays incorrect item details on the Production Orders list, Input, and Output pages when a make-to-order item is used on a family production order.
336194The system fails to display compliance documents when the Utilize Graph API for SharePoint connection toggle on the Shop Floor Production Setup page is turned on.
326567The system incorrectly auto-fills the expiration date while registering the output, even when the Require Expiration Date Entry toggle on the Item Tracking Code page is turned on.
331339The system fails to set the default value in the Quality Control Extension field on the Shop Floor Production Setup page.
290353The system fails to display whether an input component belongs to the entire production family or to a specific production order line when the Register Input page opens.
336096The system incorrectly calculates the Quantity and Direct Cost field values on the Capacity Ledger Entries page when a production routing uses two linked work centers that have different units of measure with the Labor toggle turned on for one work center and turned off for another work center.