Manage routing and scheduling documents
Aptean Routing and Scheduling
•
Article
•
3/12/2025
•
You can view the details of the routing and scheduling processes in the following fields on the Routing And Scheduling Documents page.
| Field | Description |
|---|---|
| Integration Source Link Type | Specifies the source link type of the integration document: SO (Sales order) or TR (Transport request). |
| Integration Source Link ID | Specifies the source link ID of the integration document. |
| Document Type | Specifies the document type. The available options are:
|
| Document No. | Specifies the number of the associated document. |
| Schedule ID | Specifies the scheduled ID for the transport route on which the goods in the transport order are planned to be delivered. |
| Route No. | Specifies the transport route on which the goods in the transport order are planned to be delivered. |
| Trip No. | Specifies the code that is used to split a single source document into multiple transport requests. |
| Trip Drop Num | Specifies the trip drop number. |
| Last Shipment Date | Specifies the shipment date that was successfully sent. |
| Outbound Integration Status | Specifies the outbound export status of the document. The available options are:
|
| Inbound Integration Status | Specifies the inbound import status of the document. The available options are:
|
| Last Inbound Integration DateTime | Specifies the latest import date and time of the document. |