Integration with Aptean Integration Platform connector
The Aptean Integration Platform connector must be installed to use the Aptean POD Integration Connector, as the job queue configurations are set up on the AIP Setup page and event processing relies on the AIP framework. Additionally, when you execute the Mark as Fully Loaded action on the Transport Order page, the outbound event includes planned time fields in GMT Standard Time. To know more, see Aptean Integration Platform Connector.
You can execute the Configure with AIP action on the Proof of Delivery Setup page to connect with the Aptean Integration Platform. When the Aptean Routing and Scheduling extension is installed, the system sends a request to AIP to subscribe to events for the Proof of Delivery (POD) and Routing and Scheduling (RAS) products for the current tenant, and maps the products, definition types, and event subscriptions in one step.
You can define the stop date and stop time information in the data sent to the transport request based on the transport stop, either delivery or pickup. These fields specify the exact date and time for pickups or deliveries, helping you plan and manage transport schedules more accurately.