Post the quick production entry

Article • 4/1/2025 • 3 min read

Post the quick production entry for consumption

You can post the consumption for a production order based on the quantities specified in the Qty. to Consume or the Quick Production Additional Consumption records.

  1. Open the Quick Production Entry page.
  2. On the action bar, select Post.

After posting the production order for consumption,


A new record (consumption line) can be created regardless of the option selected in the Additional Consumption Rule if the item number does not already exist among the component lines.

Post the quick production entry for output

You can post the output for a production order based on the values specified in the Qty. to Output and Run Time fields.

After posting the production order for output,


You can also perform the Output posting via the Output Journal or Production Journal.

For more information, see Batch Post Output and Run Times.

Error handling

To avoid common errors when posting the quick production entry, ensure the following conditions are met: