Configure sublot management

Article • 5/22/2025 • 1 min read

You can configure sublots to inherit slaughter date information from parent lots to ensure traceability.

This functionality is available only when the Aptean Sublot Management extension is installed.

To set up a sublot, follow these steps:

  1. Select the Search icon alt text, enter Lot No. Information List, and then choose the related link.
    The Lot No. Information List page opens.
  2. Select the lot for which you want to create a sublot and then open the Lot No. Information Card page.
  3. On the action bar, select Create Sublot action.
  4. Select the AssitEdit alt text and execute the Assign Lot No. action. New lot is created in the Sublot No. field on the Craete Sublot page.
  5. On the action bar, select Sublots.
    The Sublots page opens, displaying the list of sublots.

To view the slaughter date for a sublot:

You can select the required sublot. The Lot No. Information Card page opens.The Slaughter Date field value for the sublot is inherited from the parent lot.