Set up production order routing

Article • 1/24/2024 • 2 min read

Production Order Routing

The Prod. Routing Zero Run Time toggle is added to the Posting FastTab on the Work Center page. This field specifies whether the run time of the resource must be used exclusively for cost roll-up purposes without affecting the overall run time of a production order. Turning on this toggle ensures that the run time of the resources contributes solely to cost calculations and not to the total production order duration.


Click Show more on the Posting FastTab on the Work Center page to be able to view the Prod. Routing Zero Run Time toggle.

You can set up the routing with the work center for which the Prod. Routing Zero Run Time toggle is turned on.